As summer in Kosovo is heating up so are efforts to move towards a fall completion of Phase 2. Work on the exterior façade is bringing the building to life with multiple colors and patterns to stimulate interest. Interior finishing continues with ceilings, floors, handrail fabrication, electrical, mechanical and many other details that will make the building a great school facility.
In-floor electrical and communications with insulation prepared for topping slab
Concrete topping slab installation
Façade work in progress
Finished façade work
Handrail fabrication in stairwells
Toilet Fixture plumbing rough-in