Monday, March 25, 2019

2019_03 - KLA Construction Progress

The cold weather and snow in February slowed work on the structure a little, but work continued on the brick walls inside the school in preparation of spring's arrival.  As March closes out work is picking up on the exterior of the school with the completion of roof framing, window installation and the start of the metal roof installation.  The team is optimistic to have funds on hand soon to contractor for the building's exterior and interior finishing to get kids moved into two levels sometime this fall.

 Framing for concrete work in one of the three stairways

 The building facade receiving brick in preparation for the windows

 What will be the main corridor with classrooms to the right

 Roof framing beginning

 Roof framing complete!

 It's a beautiful site!  The building will eventually house 27 classrooms!

Window installation nearing complete.