November brought a change in temperatures and weather conditions to Mitrovice, but construction has continued. The contractor is working on form work for the third floor and columns to support the roof slab. When weather does not allow for the forming to be done the team retreats to the lower levels to lay up the clay block walls. The walls will eventually be covered by insulation and a hard stucco finish in the exterior. The interior clay block walls will be covered by a finish plaster system. It's a race against the weather during this time of the year!
Column forming and reinforcing on the third floor
Third floor middle section being prepared for concrete
Clay block walls being installed on lower levels
North Wing - West Facade
No comments:
Post a Comment