Work over the last month included completion of the ground level slabs and utilities, form work for the first elevated slab and even the pouring of sections of the slab.
Foundation waterproofing at the elevator pit
In-slab utilities ready to be covered
First run of stairs poured
Form work for first elevated slab
First elevated slab being prepared for a concrete pour
The first graduating class of the KLA leaving their mark on the KLA
Panoramic view of the busy construction site.
We are hopeful to raise the final $300,000 needed to release the contractor to build-out the ground level, first level and exterior wall finishing. If these funds can be in place by the end of December we believe 18 classrooms could be on line near the beginning of the 2019 school year!